The Ministry of Public Works and Transport has completed the final works on the temporary crossing at the "February 6" Bridge between the towns of Al-Zarariyah and Tair Falsay. This follows the completion of road striping and the installation of solar-powered road studs ("Cat Eyes") to enhance lane visibility and traffic safety, especially at night.

This step concludes a series of necessary works to establish the alternative crossing, which included installing concrete culverts for drainage, backfilling, leveling, and asphalt paving. These measures ensure the continuity of traffic flow and connectivity between regions while the bridge, damaged by Israeli attacks, is being rehabilitated.

The Ministry affirmed its ongoing efforts to address the damage sustained by the road and bridge network in the South, prioritizing citizen safety and secure transportation.